国产一区二区三区亚洲av,成人av综合亚洲一区二区,波多野结衣乱码中文字幕,国产★浪潮AV无码性色

Cooler type
Your location : Home > Product > Cooler type

Blowdown cooler

A sewage cooler is an equipment that uses chemically treated water or raw water to cool sewage or other wastewater. Reduced heat loss while heating chemically treated water, increasing heat rate. It can also be used for cooling or heating water and steam media. There are two forms of sewage coolers: tubular sewage coolers and surface sewage coolers.
Online inquiry
  • Content details

Purpose of sewage cooler:


A sewage cooler is an equipment that uses chemically treated water or raw water to cool sewage or other wastewater. Reduced heat loss while heating chemically treated water, improving heat efficiency. It can also be used for cooling or heating water and steam media. There are two forms of sewage coolers: tubular sewage coolers and surface sewage coolers. The sewage from various power plants is discharged into the trench, wasting a large amount of water vapor and the heat it contains. Improper operation and adjustment can cause drainage pressure, posing a safety hazard and threatening the safe and economic operation of the power plant. To address this issue, Lianyungang Lingdong Electromechanical Equipment Co., Ltd. has designed a sewage cooler.


Installation and operation of sewage cooler:


① After the equipment is transported to the site, a foundation seat should be made according to the size of the equipment's support, and then fixed with bolts.


② The valves for controlling the flow of sewage and cooling water are arranged by the user according to their respective positions.


③ Pressure gauges and thermometer interfaces should be installed on the sewage (cooled water) and cooling water inlet and outlet pipes for easy adjustment of pressure and temperature.


④ Connect all pipelines correctly, ensure leakage, and then put them into trial operation. Only after confirming and switching to normal can it be put into normal operation.


⑤ During operation, if faults or poor operation are found, the operation should be stopped immediately for inspection or repair.


⑥ Equipment should be regularly repaired according to operating records, and the repair cycle should be determined based on the operating conditions.


⑦ When the equipment is stopped for a long time, all water should be drained and internal temperature reduction or other methods should be used to prevent corrosion of the equipment.


Sewage cooler - benefit:


1. Environmental benefits:


After the installation of the sewage cooler, the phenomenon of 銀行卡white dragon銀行卡 in the exhaust steam of the machine room was eliminated, and at the same time, the vibration caused by low temperature water inlet in the deaerator and the phenomenon of water in the exhaust steam were eliminated. The reduction of sewage noise and thermal pollution emissions has greatly improved the surrounding environment, which is of positive significance for power plants to establish their own environmental image.


2. Economic Benefit Assessment:


(1) Recovery amount of working fluid


You can calculate the annual production cost savings based on your own international chemical water production costs. We will not make detailed calculations.


(2) Recovered heat


The heat absorption of chemical water replenishment is 3434.60035 GJ/n, and the standard heat generation of coal is 29310 kJ/kg. Therefore, the heat recovery of the sewage cooling device is equivalent to 117.218462 tons/year of standard coal. You can calculate the annual production cost savings based on your own international coal-fired grid. We will not make detailed calculations.


Tubular sewage cooler structure:


The tubular sewage cooler is mainly composed of accessories such as shell, tube bundle, left water chamber, right water chamber, support and pipeline. The shell is made of seamless steel pipes. The tube bundle consists of several stainless steel tubes (304 or 316L material), left and right tube plates, and partitions. The connection between the tube plate and the cooling tube is achieved through expansion or argon arc welding.


Surface type sewage cooler structure:


The surface sewage cooler, also known as the sewage discharge cooling device, is a surface cooler composed of a serpentine tube bundle, a shell, and related connecting parts. The pipe material is stainless steel, and the shell material is carbon steel. The surface type sewage cooler has advantages such as low steam resistance, high heat transfer rate, easy installation and maintenance.


Surface type sewage cooler equipment system - Connection and operation:


1. Surface type sewage cooler equipment system - connection:


① The surface type sewage cooler should be connected to the sewage expansion vessel (sewage expander);


② The inlet of the surface type sewage cooler is connected to the desalination water pipeline, and the outlet is connected to the desalination water inlet at the deaerator tower head;


③ The non condensable gas cooled by the surface type sewage cooler is discharged from the exhaust port, and the condensed drainage is discharged to the low-level water tank.


2. Operation of surface type sewage cooler equipment:


After the installation of the sewage cooling device, cold water is introduced, and then sewage is discharged. The water inflow is adjusted by the surface type sewage cooler according to the demand for water replenishment.


The function of the tubular sewage cooler:


A tubular sewage cooler is a system where sewage (cooled water) enters the upper tube side of the left water chamber of the heat exchanger, passes through the lower tube side of the heat exchanger through the right water chamber, and is discharged from the left water chamber of the heat exchanger; After the cooling water enters from the heat exchange shell, it flows in the opposite direction with the cooling water through the baffle plate on the main road, and is discharged from the heat exchange shell, fully exchanging heat with the discharged sewage.


Principle of surface type sewage cooler:


Without affecting the normal operation of the unit equipment, utilizing the heat of the discharged sewage, the surface type sewage cooler is used to heat the make-up water to enter the deaerator, so that its temperature rises before entering the deaerator, achieving the goal of reducing the air consumption of the deaerator, reducing the lifting degree of the deaerator water, improving the operation of the deaerator, and increasing production economy.


Model description of sewage cooler:


□ - □


(1) □ Name: RJ - represents sewage cooler (or heat exchanger)


(2) Use numbers to indicate its nominal heat transfer area


Design parameters of sewage cooler:


 

換熱面積:7.5~35㎡換熱器類別:二類換熱器
管程介質(zhì):排污水(被冷卻水)殼體介質(zhì):除鹽水(冷卻水)
設(shè)計壓力:0.7~1.0MPa設(shè)計壓力:0.7~1.0MPa
工作壓力:0.5~0.8MPa工作壓力:0.5~0.8MPa
設(shè)計溫度:150~300℃設(shè)計溫度:100~150℃
-壓試驗壓力:0.9~1.2MPa-壓試驗壓力:0.9~1.2MPa

Instructions for ordering sewage coolers:


1. The purchaser shall provide relevant technical parameters or design and manufacturing drawings of the sewage cooler.


2. The structure, working pressure, working temperature, and volume of the sewage discharge and sewage expansion tank (sewage expander).


3. Material selection: Shell material (carbon steel or stainless steel), pipe material (stainless steel pipe 304.316L, etc.).


4. Form of sewage cooler: Choose between tubular sewage cooler and surface sewage cooler.


產(chǎn)品動態(tài)

Copyright ? 2012-2023 Lianyungang Lingdong Electromechanical Equipment Co., Ltd all rights reserved

Tel

0518-85370171

一区二区三区四区五区黄色-色哟哟精品免费专区在线-很色精品99在线观看-亚洲一区二区三区精品久久| 亚洲自拍偷拍另类第一页-麻豆国产午夜在线精品-久久精品一区二区三区综合-日本最近中文字幕免费| 热99在线视频免费观看-日本老男人同性恋黄色.-精品国产一区二区三区四不卡在线-久亚洲一线产区二线产区三线麻豆| 亚洲av午夜精品久久看一区-日韩欧美91麻豆精东-久久一区二区三区在线观看-国产黄色人人爱人人做| 狠狠久久五月综合色和啪-日韩精品欧美一区二区三区软件-亚洲女同精品一区二区久久-国产传媒在线视频免费观看| 人妻中文字幕一区二区三区-国产精品丝袜久久亚洲不卡-久久伊人精品色婷婷国产-日韩中精品文字幕在线一区| 激情性插进去视频伦理-成人黄网站免费永久在线观看-青草视频在线观看这里只有精品-国产精品高潮久久呻吟av| 亚洲欧美日韩久久精品专区-99午夜福利一区二区-亚洲国产毛片一区二区三区-人妻自拍视频在线播放| 日韩av高清不卡一区二区-国产亚洲性色av大片久久香蕉-国产亚洲欧美韩国日本-国产精品国产三级国产普通话对白| 成熟女人毛茸茸的免费视频-91麻豆精品国产自产在线游戏-国产男女猛烈无遮挡免费视频-一级黄片国产精品久久| 四虎在线观看视频官网-国产免费一区二区不卡-色老99久久九九爱精品-巨乳人妻在线中文字幕| 国产成人精品一区二区日出白浆-亚洲女优大片在线观看-明星换脸av一区二区三区-四虎影院国产精品久久| 久久夜色国产精品亚洲-国产视频一区二区三区免费观看-亚洲一区二区成人在线观看-日韩精品一区二区三区在线视频| 天堂网日韩一区二区三区四区-自拍视频在线观看地址-91麻豆视频免费入口-国产理论片一区二区三区| 亚洲中文字幕五月五月婷-极品毛片av一区二区三区-欧美精品天堂一区二区不卡-精品一区二区不卡在线播放| 欧美日韩偷拍丝袜美女二区-精品少妇人妻av免费久久洗澡-四虎精品永久在线观看视频-亚洲国产成人一区二区在线观看| 精品国产中文字幕在线视频-性生活视频在线观看欧美-成年人免费黄片内射国产-国产欧美另类精品久久久| 国产精品亚洲精品午夜-欧美日韩成人精品久久二区-自拍偷拍福利视频在线观看-91精品蜜桃一区二区三区| 四虎国产在线播放精品免费99-一区二区三区中文字幕日本-91国偷自产中文字幕久久-青青草一级视频在线观看| 99久久亚洲综合网精品-久久热福利视频在线观看-日韩av人妻中文字幕-日本一区二区三区视频在线播放| 日本老熟妇在线视频网-精品人妻在线一区二区三区视频-91亚洲国产成人精品福利-青青草免费手机直播视频| 国产精品亚洲精品日韩精品-狠狠爱婷婷网五月天久久-国产精品激情成色在人-国产农村妇女精品三级一区二区| 少妇无套内谢免费视频-色婷婷性感在线观看视频-国产免费黄色一级大片-国产亚洲精品麻豆一区二区| 日韩一卡二卡在线播放-亚洲国产精品懂色av-青青热久免费精品视频在-久久精品中文字幕一区二区三区| 日韩久久久久久中文字幕-九九热视频精选在线播放-亚洲最大黄色成人av-亚洲最大av一区二区| 日本一区二区三区黄色网-亚洲国产综合久久天堂-精品国产乱码久久蜜桃-欧美少妇精品在线观看| 国产精品熟女露脸对白-欲求不满中文字幕在线-日本一区二区三区的免费视频观看-激情久久av一区二区三区四区| 亚洲黄色精品在线播放-国产精品对白在线播放-日韩熟女熟妇久久精品综合-人妻人妻少妇在线系列| 久久中文字幕亚洲天堂-午夜国产成人福利视频-亚欧天堂成人av成人-熟女乱中文字幕熟女熟妇| 日本一区二区三区三级视频-亚洲国产精品一区二区久-蜜桃视频网站免费观看-在线视频中文字幕一区二区| 日本一区二区三区三级视频-亚洲国产精品一区二区久-蜜桃视频网站免费观看-在线视频中文字幕一区二区| 亚洲国产高清在线一区二区三区-最近免费视频观看在线播放-中出内射视频在线播放-97碰碰日本乱偷人妻禁片| 91高清在线观看播放-av在线免费观看男人天堂-九九热在线视频免费观看-美女脱内裤露出隐私部位| a在线观看视频在线播放-81精品人妻一区二区三区蜜桃-国产午夜福利片一级做-在线观看亚洲视频一区二区| 亚洲国产一区二区精品专-人妻被黑人侵犯中文字幕夜色-国模午夜写真福利在线-成人自拍偷拍在线观看| 深夜福利导航在线观看-情色视频在线观看一区二区三区-丝袜美腿诱惑福利视频-国产最新福利一区二区三区蜜桃| 国产成人啪午夜精品网站-国产乱码精品一区二区三区-男人天堂网av一区二区三区四区-亚洲第一区二区精品三区在线| 日本道二区二区视频-精品熟女视频一区二区三区国产-国产地区国产地区视频91-亚洲欧洲日产国码综合在线| 国产熟女av中文字幕-国产星空传媒视频在线观看-久久精品在线精品视频-亚洲国产av卡一卡二| 翔田千里的五十路六十路-精品国产综合一区二区三区-久久婷婷色中文字幕免费高清-国产精品伦理视频一区二区| 午夜性色福利在线视频福利-久久精品视频免费获取地址-亚洲一区二区三区在线观看不卡-无套进入美女免费观看视频|